Processing of Corrugated Pipes for C-50 Precast Beams and Plastic Corrugated Pipes for C-100 Prestressed Concrete Bridges
1. Product Overview
Prestressed plastic bamboo-joint pipes (also known as corrugated pipes or prestressed tendon sleeves) are corrugated pipes made of high-density polyethylene (HDPE) or polypropylene (PP), featuring a bamboo-joint-like structure on the surface. They are commonly used in post-tensioned prestressed concrete engineering to encase steel strands or reinforcement bars, preventing them from bonding with concrete while providing anti-corrosion and anti-seepage protection.
2. Construction Process
(1) Pre-construction Preparation
- Material Inspection: Ensure the bamboo-joint pipes are free from damage or deformation, and their specifications (inner diameter, ring stiffness, etc.) meet design requirements.
- Tool Preparation: Cutting knives, connecting sleeves, tape, positioning brackets, etc.
- Site Survey: Confirm the layout route of prestressed tendons and anchorage positions.
(2) Pipeline Installation
- Positioning and Installation: Fix the bamboo-joint pipes according to the design drawings, typically using reinforcement brackets or binding wires. The spacing for Processing of Corrugated Pipes for C-50 Precast Beams and Plastic Corrugated Pipes for C-100 Prestressed Concrete Bridges should be ≤1m, ensuring smoothness and avoiding sharp bends.
- Connection Handling:
- Sleeve Connection Method: Use specialized connecting sleeves, insert both ends into the bamboo-joint pipes, and seal with tape.
- Thermal Fusion Method: For HDPE pipes, thermal fusion welding can be used to ensure leak-free joints.
- Bend Handling: The bending radius must be ≥30 times the pipe diameter to avoid sharp angles.
(3) Prestressed Tendon Threading
- Pre-threading Inspection: Clear any debris inside the pipe to ensure unobstructed passage.
- Threading Method: Manual pushing or assisted by a traction machine can be used for Processing of Corrugated Pipes for C-50 Precast Beams and Plastic Corrugated Pipes for C-100 Prestressed Concrete Bridges, avoiding scratches on the pipe wall by steel strands.
(4) Setting of Grouting Holes and Vent Holes
- Set vent holes at high points and grouting holes at low points of the pipeline, with spacing preferably ≤30m.
(5) Concrete Pouring
- Avoid direct contact of vibrators with bamboo-joint pipes during pouring to prevent cracking or displacement.
(6) Prestressing Tensioning and Grouting
- After Tensioning Completion: Promptly inject cement grout (water-cement ratio of 0.4~0.45) from low to high points, and seal after thick grout flows out from vent holes.
3. Construction Precautions
- Protection Measures: Avoid stepping on or compressing the pipeline with heavy objects to prevent deformation.
- Sealing: All joints must be tightly sealed to prevent grout leakage.
- Environmental Adaptability: In low-temperature environments, choose cold-resistant pipes to avoid brittleness and cracking.